"Operation 80th Celebration" Home | Site Map
J.S. Winstons - Sound Doctrine Foundation

"But Speak Thou The Things Which Become Sound Doctrine"

Titus 2:1

History News & Events About Us Contact Us Privacy

J.S. Winston Sound Doctorine Foundation Cottage Construction Progress

Page1 Page2  Page3  Page4  Page5 Page 3
Here is a sheet of the 16"in ceramic tile that will be installed in the first cottage
   

Things are moving and shaking,walls are goin up, materials are being delivered, and cement trucks are pouring the street, parking spaces and sidewalks.

   
The walls are up, the windows are in, and the roof is being framed.
   

The 1st of 190" ft. street has been poured, and parking spaces are being poured in this picture.


   

   
Copyright © 1982-2010 J.S. Winston ~ Sound Doctrine Foundation. All rights reserved. ~ Site Last Updated 01/09/2010 ~ Privacy Statement